PRODUCTS CENTER
Product Description
GSU series bridge grab ship unloader
1. Introduction
1.1. Purpose
Bridge grab ship unloading is a mature, efficient and safe ship unloading equipment, which is widely used in power, port, metallurgy, building materials and other industries. It is an indispensable main coal unloading equipment in coastal and inland thermal power plants.The bridge type grab ship is installed on the track of the quay along the river and along the coast. The bulk materials (such as coal, ore, mineral powder, cement, coke, ash, grain, etc.) in the cabin are grabbed by the grab and moved to the hopper on the machine. The grab is opened to unload the materials into the hopper, and the materials are transported to the quay system belt through the feeding equipment at the lower part of the hopper On the machine, the material is transported to the storage yard through the system belt conveyor.
1.2 model meaning
GSU****-####
GSU--------- Bridge type grab ship unloader
****------------Rated production capacity (T / h)
####----------Maximum extension (m)
1.3. Classification and structural characteristics
1.3.1. Classification of bridge type grab ship unloader. The bridge type grab ship unloader can be divided into self-propelled trolley type and wire rope traction trolley type from the trolley type. Traction trolley type is divided into main auxiliary trolley type and differential four drum single trolley type, and differential four drum type is divided into mechanical differential and electrical differential.
1.3.2. Structural characteristics.
1.3.2.1. Structural features of the self-propelled trolley ship unloader: place the grab lifting mechanism, opening and closing mechanism and trolley traveling mechanism on a trolley frame, and the trolley can walk on the bridge track by relying on the trolley traveling mechanism. It has the advantages of no complex wire rope winding system, no pulley, short wire rope and less annual rope consumption. However, the mass of the trolley is 10 or 20 times heavier than that of the towing trolley, which leads to the increase of the whole machine mass, the wheel pressure and the leg pressure of the ship unloader, and the high cost of equipment and wharf engineering. It is difficult to supply power and communicate with the moving car because of the large inertia of the car and the large horizontal shaking of the whole machine.
1.3.2.2. Structural features of the towing trolley unloader: the lifting mechanism, closing mechanism, trolley running mechanism and electrical equipment of the unloader are all placed in the machine room on the bridge. The trolley is driven by steel wire rope and equipped with several guide pulleys. The lifting rope and closing rope of the grab are wound on the drum of the lifting mechanism and closing mechanism by bypassing the guide pulley on the trolley. Therefore, the self weight of the car is very light, and there is no need to supply power to the car.
Traction trolley ship unloader requires that the grab must move horizontally along the bridge direction when the trolley is running under the condition that the lifting mechanism and the closing mechanism of the grab are not working. In order to meet this relationship, many kinds of wire rope winding methods are designed, and more differential four drum single car with balance car and double car without balance car are used.
1.3.2.3. Structural features of traction trolley with balance trolley: traction trolley with balance trolley is the most widely used traction ship unloader, and its technology is relatively mature and reliable. There is a grab trolley and a balance trolley on the bridge. The lifting rope is from the lifting drum to the grab through the guide pulley, through the pulley on the balance trolley, and then around the pulley on the grab trolley; the winding route of the closed rope is the same as that of the lifting rope. The trolley traction rope is connected with the grab trolley after passing through the guide pulley at the head of the bridge from the traction winch. The other one is backward, passing through the pulley at the tail of the bridge, bypassing the pulley on the balance trolley, and then returning to the tail of the bridge for fixation. The ratio of steel wire rope on grab car is 1, and that on balance car is 2. When the traction winch works, the grab car and the balance car move in the same direction at the same time, and their speed and walking distance, the balance car is 1 / 2 of the grab car, so as to ensure that the grab car moves horizontally.
Because of the balance trolley, the grab can move along the horizontal track when the lifting mechanism and the closing mechanism are not moving; because of the supporting role of the balance trolley, the maximum distance between the lifting rope and the closing rope along the bridge direction of the two groups of guide pulleys is small, so the trolley does not need to add a supporting rope.
The hoisting mechanism, closing mechanism and trolley running mechanism of grab can be designed as independent mechanisms, and the standard reducer can be selected for the reducer, which is convenient for maintenance and repair; the winding system of steel wire rope is complex, with many bends, and easy to wear; the consumption of steel wire rope is large, there are many pulleys, the mechanism is complex, and the workload of rope replacement is large.
1.3.2.4. Mechanical differential four drum traction trolley structure features: lifting motor, closing motor and trolley traveling motor are assembled by two specially designed planetary reducers to drive four drums. The two drums on the same side wind two wire ropes respectively around the change direction pulley at the head and tail of the bridge to the grab car, and then fix them on the grab car through the change direction pulley on the grab car. All functions of grab lifting, closing and trolley traveling are realized by these four drums, and various action combinations of grab are realized by the differential of inner ring and outer ring of two planetary reducers.
Because there is only one grab car, four wire ropes, the winding system is relatively simple. Less wire rope and less pulley.
The hoisting and closing of the grab are combined with the traveling mechanism of the trolley, which has a compact structure and small occupation space. When the grab is in the compound movement of lifting and horizontal movement, the wire rope line speed is the superposition of the lifting and translation speed of the grab, and the wire rope is worn fast.
Two complex and special planetary reducers are used, which are of high quality and poor generality. They have high technical requirements for maintenance personnel and long maintenance time, which is not conducive to routine maintenance.
The demand for spare parts of planetary reducer is large and the cost is high.
When the extension distance is large, steel wire rope support is required
1.3.2.5. Electric differential four drum traction trolley structure features: the mechanism controlling the grab action is completed by four completely independent and identical winch mechanisms set in the machine room, each winch mechanism is driven by AC frequency conversion motor, and each drum is wound with a wire rope. Two wire ropes are wound forward to the grab car through the pulley at the end of the front girder, and the other two ropes are wound to the grab car through the pulley at the end of the rear girder.
The electric differential ship unloader does not have a single trolley traverse mechanism, no wire rope tension mechanism, and does not need a balance trolley for grab wire rope compensation, so it saves quality, reduces wheel pressure, and properly reduces the wharf cost.
There are only four steel wire ropes, which are simple in winding and convenient in maintenance; there is no trolley to traverse the steel wire rope, which reduces the maintenance amount and spare steel wire rope; there is no trolley to traverse the mechanism, which reduces the maintenance amount and spare parts amount.
Four identical winches are used as the driving mechanism of grab, and no more spare parts are needed; all reducers are standard hard tooth reducers, which are convenient for maintenance. Only one wire rope is driven by one drum, so it is quick and convenient to replace the wire rope.
The four electric differential reels are four sets of independent winch mechanisms, which are more flexible and maneuverable in layout, with larger maintenance space and easy maintenance operation.
1.4. Working principle
The grab action actuator of the ship unloader is completed by the lifting, opening and closing mechanism and the trolley traverse mechanism set in the machine room, and the operation mechanism is completed by the handle set on the linkage platform in the cab.
The open grab is located above the material in the cabin, and the closed grab lifts the material to the safe height of the hatch. According to the set route, the grab lifts at the same time and moves to the landside, To the hopper set on the ship unloader, open the grab to discharge the material into the hopper, return the grab to the upper part of the cabin material according to the set route for the second grab, so that the ship unloader completes a working cycle, and completes all the working cycles in turn.
The material in the hopper is continuously delivered to the wharf belt conveyor through the feeder under the hopper and to the power plant pile through the belt conveyor
The ship unloader is equipped with a crane traveling mechanism, which can walk along the dock track to meet the operation requirements of different hatches and positions, and can also move the ship unloader to non operation area and maintenance position.
The ship unloader is equipped with a pitching mechanism, which can lift the front girder to 80 and lock it with a safety hook. In order to meet the requirements of ship unloader cross cabin operation, ship berthing and offshore. When the ship unloader does not work for a long time and typhoon comes, the front girder shall be raised and locked safely.
The ship unloader is equipped with rail clamping (wheel) device and anchoring device to ensure the safety of the ship unloader operation and the equipment when typhoon comes.
The cab can walk along the track under the girder to ensure the best vision of the operator.
The ship unloader has three operation modes: local, manual and semi-automatic.
2. Main technical data
Main techical data of GSU series bridge type grad ship unloader, see table 18-1
Table 18-1
| Model | Capacity | Max. Extension | Track Span | Total Installed Power | Max. wheel Pressure | Suggested Track |
| ( t/h) | (m) | (m) | (kW) | (kN) | ||
| GSU340. 21 | 340 | 23 | 16 | 480 | 320 | QUO) |
| GSUI000. 27 | 1000 | 27 | 14 | 1100 | 350 | QU80 |
| GSU1250. 28 | 1250 | 28 | 22 | 1500 | 500 | QU100 |
| GSU1400. 30 | 1400 | 30 | 22 | 1700 | 550 | QUIO() |
| GSU1500. 31 | 1500 | 31 | 22 | 1800 | 500 | QUIOO |
| GSUI 500.33 | 1500 | 33 | 22 | 1500 | 550 | QUIOO |
| GSU1600. 30 | 1600 | 30 | 26 | 1600 | 500 | QU120 |
| GSU1650. 32 | 1650 | 32 | 26 | 1800 | 500 | QU100/A100 |
| GSU1800. 30 | 1800 | 30 | 22 | 1900 | 600 | QU100 |
| GSU1800. 39 | 1800 | 39 | 26 | 2000 | 700 | QU120 |
| GSU1800.42 | 1800 | 42 | 26 | 2000 | 600 | QU120 |
| GSU2000. 28 | 2000 | 28 | 20 | 2400 | 600 | QUIOO |
| GSU2100. 40 | 2100 | 40 | 26 | 2450 | 750 | QU120 |
3. Outline dimensions of the equipment
See Fig. 18-1

5. Scope of supply and ordering instructions
5.1. Scope of supply
Provide complete equipment above crane track (excluding track), including metal structure, lifting / opening / closing winch mechanism, trolley winch mechanism, girder pitching mechanism, crane traveling mechanism, feeding system, grab, trolley, dust removal system, hydraulic system, lubrication system, accessory structure, rail clamp (wheel), anchor device, elevator Maintain crane, electrical system, spare parts and special tools.
According to the requirements of users, it can also be responsible for the transportation, installation, commissioning, etc. of the equipment, and implement the turnkey project.
If the user needs, it can also provide the roll on shipping mode of the whole machine.
5.2. Ordering instructions
The data to be provided during ordering include: rated production capacity, lifting capacity, extension distance, track gauge and wheelbase, wheel pressure, lifting height above and below the track, power supply and water supply mode, material characteristics, water level data, ship type data, meteorological data (temperature, wind pressure, humidity, etc.), wharf process layout (plan and sectional drawing), etc.