Category:
Product Description
Single and double flow condenser
1. Introduction
1.1. Purpose
The condenser is mainly used in 330MW steam turbine generator unit of power station, which acts as a cold source in the thermal cycle of the unit. It continuously receives the exhaust steam of the steam turbine, condenses it into condensate water, and then recovers the clean condensate water as boiler feed water, so as to establish and maintain the required vacuum value at the steam turbine exhaust port.
1.2. Model meaning
N**-##
N -- Code of condenser
**-----Cooling area (M2)
##--------Type code
1.3. Structural features
1.3.1. Structural form. The condenser of 330MW steam turbine has two series of single flow and double flow. Among them, the single process condenser adopts the radial arrangement of strip tube bundle, and the double flow condenser adopts two forms of dense pipe bundle trapezoidal arrangement and church window tube bundle arrangement.
1.3.1.1. The single process condenser mainly includes the following series: N17200-I, N17500-I, N18000-I, N18400-I, etc. (basically derived from N16920-I of Inner Mongolia Daqi power plant).
1.3.1.2. The double flow condenser is also divided into two forms: ① dense tube bundle trapezoidal arrangement, such as N17600-I; ② church window tube bundle arrangement, such as N19000-I.
The above condensers are widely used in 300 MW wet cooling generating units, and now they are also used in direct air cooling units.
1.3.2. Description of important parts:
1.3.2.1. Block principle and installation measures of large condenser. The condenser of 330MW steam turbine is divided into 9 integral modules and a large number of loose parts. The whole condenser is trial assembled at the manufacturing site, and the connection mark is made. The overall assembly is carried out after the installation site. Due to the different transportation conditions, the blocks are also different. For example, in railway transportation, the shell and tube bundle clapboard are transported to the installation site as loose parts, and then assembled according to the instructions and drawings; while under the conditions of highway transportation and water transportation, the shell and tube bundle clapboard can be produced by modules at the manufacturing site, greatly reducing the manufacturing cycle of the installation site.
There is a 5 ‰ inclination of the tube bundle from the inlet to the outlet of the water chamber, which is beneficial to prevent the condensation water droplets from remaining on the surface of the tube, thus affecting the heat transfer and improving the water flow in the pipe. In order to achieve this, two measures are taken in the structural design. In order to ensure that the tube is in the center of the tube plate hole, the tube plate is also inclined by 5 ‰ during installation. Of course, this slope should also be considered in the structural design of the water chamber connected with the tubesheet. The tube supporting baffle plate is orthogonal to the horizontal axis of the condenser. In order to ensure that the tube passes through each partition board smoothly from one end of the tubesheet and is connected with the diaphragm at the other end, in addition to considering this slope in the design of the baffle plate, fine adjustment is also carried out at the bottom of the baffle plate in the installation, which brings convenience to the installation. This design method is also used in the condenser design of 200MW steam turbine.
The performance of the condenser is greatly affected by the rising of the tube sheet. For example, under expansion or over expansion will cause tube leakage, and excessive expansion will also cause large prestress, which will affect the service life of the tube. Therefore, before expanding the pipe, the tightening force of the pipe shall be tested, and a special expansion test box shall be provided for the field expansion test to determine the expansion torque
1.3.2.2. Elastic design principle. The force transfer of the condenser structure is considered according to elastic design, and the strength calculation refers to Hei standard. Because of its clear transmission route and few additional redundant components, the condenser has a lighter structure and lower manufacturing cost. For example, the total weight of the condenser is only 367t (the total weight of copper heat exchange tube and stainless steel is only 300t). The operation shows that the strength and rigidity of the condenser meet the requirements of operation.
1.3.2.3. Arrangement of equipment at neck joint. For the operation and performance of the condenser, the tube bundle is a key, and the flow in the exhaust neck and shell is also important. These flows depend on the geometry of the turbine exhaust flow, the characteristics of the exhaust steam flow of the low pressure cylinder, the shape of the exhaust connection neck and the shape of the equipment installed in the connection neck. The bad operation caused by improper arrangement of equipment occurs from time to time
Seven steam extraction pipes and two low-pressure bypass desuperheater are arranged at the condenser neck. After improving the flow and reducing the pressure drop through the model test, the influence on the performance of the power station can be ignored under the condition of reasonable layout
1.3.2.4. Spring design. On the one hand, the condenser spring supports the condenser, on the other hand it plays the role of thermal compensation. Due to the rigid connection between the condenser and the low pressure cylinder, the force of the condenser on the steam turbine directly acts on the low pressure exhaust cylinder during operation. Generally, the steam turbine designer has a limit value for this force. The limit value of 330MW steam turbine for condenser is 390000N upward and 3000000N downward. This force is determined after coordination with the steam turbine designer, including repeated calculation of spring force to ensure that the spring stress value is within the allowable range. After the limit value is determined, the spring force and the number of springs can be solved.
Since the condenser weight is allowed to have an error of ± 10% in the preliminary design and final design, and there is a deviation of ± 2% between the final design and the actual weight estimation, so the final stress of the spring should meet this design condition.
After the spring design is determined, the last step is to check the stress of steam turbine according to the operation mode of condenser. The operation modes include cold state, hot state, empty weight, half side operation and half side cleaning. When the condenser is welded with the exhaust cylinder of the steam turbine, in order to make the condenser have no force on the steam turbine, it is necessary to add 33.5m3 water into the hot well, which is also determined by verification and specified in the installation and operation manual of the condenser. The spring design method is more advanced, and there is no definite design value of steam turbine force in domestic design.
1.3.2.5. Water chamber design. The design of the water chamber of the condenser adopts arc hemispherical water chamber. The arc-shaped hemispherical water chamber has the following characteristics: the path of circulating water entering the tube bundle is short; the water flow is uniform without eddy current area; there is no dead zone of flow, which improves the rubber ball recovery rate of the rubber ball cleaning system of the condenser; the water pressure is uniform, which ensures the water flow speed of the top pipe
1.3.3. Description of important characteristics. The test results of radial tube bundle condenser show that the heat transfer coefficient is close to the value obtained according to Hei standard, and other indexes also meet the excellent standard.
The holding points of radial tube bundle condenser are as follows:
1.3.3.1. The surrounding steam enters and flows through the triangular channel.
1.3.3.2. Select the steam speed entering these lobes according to the operation state of condenser (design conditions, cooling water)
1.3.3.3. A small number of tube rows in each flap can ensure the minimum pressure drop.
1.3.3.4. A steam channel is arranged at the lower part of the tube bundle to reheat and deoxidize the condensate
1.3.3.5. The central channel in each flap collects the non condensable gas and discharges it to the air cooling area, thus avoiding air accumulation.
1.3.3.6. The air cooling zone is located at the best position of the tube bundle to ensure that the pressure drop does not exceed 2-3 mbar (1 bar = 100 kPa)
2. Main technical parameters and product appearance
2.1. Main technical parameters (see table 25-1)
Table 25-1 main technical parameters of condenser
| No. | Name | Value |
| 1 | Flow form of condenser | Bisection flow |
| 2 | Total effective heat transfer area(m2) | 18000 |
| 3 | Top three layers of pipes, length (m) | 304、12.41 |
| 4 | Outer diameter × wall thickness of top three-layer pipe (mm × mm) | ∮19×0.7 |
| 5 | Condensing pipe material, length (m) | 304、12.41 |
| 6 | Outer diameter of condenser tube × wall thickness (mm) | ∮19×0.5 |
| 7 | Design circulating water volume and average flow rate(t/h、m/s) | 37093.2, ≤2.3 |
| 8 | Circulating water temperature rise (℃) | 10 |
| 9 | Number of low pressure heaters at throat | No |
| 10 | Half side overhaul possibility | Yes |
| 11 | Type of condenser tube side tube cleaning device | Rubber ball cleaning |
| 12 | Net weight of condenser (t) | 300 |
| 13 | Design pressure of shell and pipe | Shell side 0.18MPa(g)、Tube side 0.45 MPa(a) |
| 14 | Condenser steam space(m3) | 780 |
2.2. Product appearance (see Figure 25-1)

3. Selection method
According to the layout of the power station, the flow number is selected; according to the heat balance diagram provided by the steam turbine plant and the cooling water quantity, cooling water temperature, cooling water quality report and cooling water concentration ratio provided by the project, the cooling area is determined; According to the external factors such as bypass, drainage, steam exhaust, whether there is a low-pressure heater inside, the connection mode with the low-pressure cylinder of the steam turbine, and the arrangement of the connecting holes with the external equipment, the boundary conditions of the condenser and the situation of the vacuum pumping equipment are determined.
4. Scope of supply
4.1. Condenser body.
4.2. Support spring, foundation bolt and nut, spring support (or expansion joint).
4.3. Drain flash tank set on condenser.
4.4. Pressure, temperature and water level measurement interface (including balance vessel, isolation valve, etc.).
4.5. Cathodic protection facilities.
4.6. Vacuum connection.
4.7. Local indicating instruments (including connecting accessories, valves, etc.).
4.8. Special tools: the supplier shall provide a set of special tools necessary for equipment maintenance and adjustment, and provide a list of special tools, at least including condenser water chamber flange blocking plate, tube expander, expansion controller, tube expander and condenser test box. 4.9. Spare parts: 5% spare parts for condenser tube; sealing ring ∮ 24, l = 15000 mm.